National Usage of Geosynthetic-Reinforced Soil to Support Bridges
The Geosynthetic-Reinforced Soil Integrated Bridge System (GRS IBS) was developed by the Federal Highway Administration (FHWA) almost 20 years ago to help meet the demand for the next...

Very Long-Term Care of Mechanically Stabilized Earth Berms: Limiting the Liability of Future Stakeholders
Since their development over 50 years ago, civil engineering applications of mechanically stabilized earth (MSE) berms have significantly increased. When used as a component of an asset...

Geosynthetic Materials Help Build Optimized Infrastructure
In recent years, the world has begun to realize the negative impacts that limited infrastructure can have on economic growth and the well-being of humankind. Our infrastructure challenges...

Long-Term Performance Monitoring of a Hillside Retaining Wall
To accommodate expansion of the West Point Treatment Plant in Seattle, WA, a 3,000-ft-long soldier pile, tieback-anchored retaining wall was constructed from May 1991 to May 1992. An oblique...

General
Design of Latticed Steel Transmission Structures specifies requirements for the design, fabrication, and testing of members and connections for electrical transmission structures. These...

Loading, Geometry, and Analysis
This Standard applies to latticed steel transmission structures. These structures shall be either self-supporting or guyed. They consist of hot-rolled or cold-formed prismatic members...

Design of Connections
Bolted connections for transmission structures are normally designed as bearing type connections. It is assumed that bolts connecting one member to another carry the load in the connection...

Testing
The purchaser shall specify in the contract documents which structures or components of structures are to be tested. If a proof test of a structure or a component of a structure is specified,...

Structural Members and Connections Used in Foundations
This chapter specifies design procedures for steel members and connections embedded in concrete foundations or the earth. Additional design requirements for structural members and connections...

Contract Documents
As with any civil works project, the bid and contract documents prepared by the owner and the engineer should provide the contractor with the necessary information to prepare bids, to...

Shafts/Temporary Structures
Shafts should be of a size to accommodate the equipment and pipe selected and to allow for safe working practices. If the shaft must accommodate the permanent works, it is the contractor's...

Construction Support Services
A preconstruction survey of existing structures within the anticipated construction zone of influence should be conducted before any construction begins. A plan for structures that need...

Transactions of the American Society of Civil Engineers 2014
Transactions of the American Society of Civil Engineers Vol. 179, 2014 contains abstracts for all ASCE journal and periodical papers and technical notes, Civil Engineering - ASCE feature...

The New Bedford Marine Commerce Terminal
When construction of the first American offshore wind farm support terminal encountered greater challenges than expected, jet grouting enabled construction to continue....

Notes on Heavy Lift Design
The interrelated activities and responsibilities of the various organizations involved in the lift design and offshore installation of topside facilities for an offshore platform are discussed....

Performance Limits for Deepwater Pipelines
This paper highlights the differences between onshore and offshore pipeline design. It then summarizes the results of combined external pressure, tension, and bending testing on full scale...

Transactions of the American Society of Civil Engineers 2013
Transactions of the American Society of Civil Engineers Vol. 178, 2013 contains abstracts for all ASCE journal and periodical papers and technical notes, Civil Engineering - ASCE feature...

Geo-Congress 2014
Technical Papers and Keynote Lectures
Proceedings of the 2014 Geo-Congress, held in Atlanta, Georgia, February 23-26, 2014. Sponsored by the Geo-Institute of ASCE. GSP 234, Geo-Congress...

Failure of a Large Circular Excavation
A circular excavation, 117 feet (36 m) in diameter by 90 feet (27 m) deep, was designed by an experienced engineering firm and construction was performed by an experienced contractor....

Failure of a Twenty-Foot High Retaining Wall
A cantilever retaining wall, designed in apparent accord with provisions in a civil engineering handbook, failed soon after construction. Analyses of the causes of the failure are presented....

 

 

 

 

Return to search